☰ Menu
EN ⌄

Pedestrian and Bicycle Crossing Signal Selection Guide

Use this application checklist to specify pedestrian, bicycle and accessible crossing signals without confusing symbols, sizes and controller functions.

Start with the road user

Pedestrian and bicycle crossings need a clear symbol, a red/green sequence and a mounting position that matches the crossing geometry. The diameter is only one part of the specification. Confirm whether the project needs a pedestrian figure, bicycle symbol, countdown, audible prompt or push button.

Selection matrix

ApplicationSignal featuresConfirm
Pedestrian crossingRed/green figure, optional countdownViewing distance, mounting height and controller phase
Bicycle crossingBicycle symbol and dedicated phaseSymbol standard and coordination with vehicle signals
Accessible crossingAudible or tactile user interfaceLocal accessibility rules, volume and push-button position
Temporary crossingPortable or solar wireless signalBattery autonomy, synchronization and transport

Common project mistakes

Review the 2-aspect signal range, 300mm signal options and manufacturer selection guide before requesting a quote.

Request a Pedestrian Crossing Configuration

Prepare a crossing schedule

Create one line for each crossing and approach. Record the road user, required symbol, number of signal faces, mounting arrangement and the controller phase serving that movement. Attach a site sketch and mark any existing poles or cable routes that must be reused. Keep the intended operating sequence in a separate document approved by the project designer; the signal head alone does not define safe crossing timing.

Separate the signal head from accessibility equipment

A pedestrian display, push button, audible device and tactile interface are different components. List which items are being supplied and which belong to the existing installation. Confirm their electrical interfaces and mounting details with the responsible designers. A visual signal or countdown should not be described as a complete accessible crossing system merely because an optional button can be added.

Check replacement and countdown compatibility

For replacement work, photograph the existing label, terminal arrangement and mounting brackets. Verify input voltage, common wiring and cable cores against the proposed unit. When a countdown is requested, identify its timing source and the expected behaviour during phase changes or loss of that source. Ask the controller supplier to confirm compatibility before approving the signal configuration. Do not infer compatibility from diameter or display appearance alone.

Agree sample acceptance and delivery records

Before production, approve the symbol drawing, enclosure dimensions, connector layout and included accessories. Define who will inspect the sample and which project documents govern the review. On delivery, compare model labels, quantities, visible condition and supplied drawings with the approved order. Installation, timing and commissioning checks belong to qualified project personnel. Retain the approved configuration for future replacement orders rather than relying only on a photograph of the front face.

What to include in the quotation request

Send the crossing schedule, quantities per model, power supply details, controller information and relevant site drawings. Identify the destination market and any required product documentation. Include the delivery location, packaging needs and intended installation date. This information allows the supplier to identify missing components and distinguish confirmed items from options that still require engineering review.

Send drawings and request a configuration review