Mobile & Solar Traffic Lights for Temporary Road Control
Choose the right temporary or solar traffic signal setup
Mobile and solar traffic lights are used where fixed mains-fed signals are impractical, including roadworks, temporary lane control, remote intersections and events. Select the system by operating duration, available sunlight, required signal heads, trailer or tripod format, communications and whether a grid connection is available.
Start with our solar and portable traffic signal planning guide for autonomy, transport and layout considerations. For roadworks, review the temporary traffic signal deployment guide before defining the phase plan and operating procedure. Where both solar and mains are possible, compare installation and lifecycle factors in the solar versus mains traffic signal TCO guide.
Current catalogue examples for temporary and solar use
The public catalogue includes trailer, tripod, solar wireless and solar-warning configurations. Treat the examples below as a starting point; operating time, signal layout, mounting and communication must be confirmed for each project.
| Use case | Examples currently listed | Information needed before quotation |
|---|---|---|
| Temporary roadworks and intersections | 300mm four-face temporary traffic light with trailer | Approach layout, phase plan, deployment duration, towing/transport requirement and local approval rules |
| Portable or access control | 100mm portable wireless solar traffic light with tripod; 100mm solar traffic light for parking and access control | Signal-head size, mounting, daily operating hours, wireless requirement and available sunlight |
| Warning applications | 125mm, 200mm and 300mm solar warning or flasher listings | Indication, flash pattern, solar autonomy, installation position and local traffic requirement |
Documents and project inputs
Send the site location, operating schedule, signal arrangement, available solar exposure, local standard, destination, requested drawings or test records, quantity and target delivery date. This allows GAOQIAO to check configuration suitability before providing a quotation.