Traffic Signal RFQ Checklist and Specifications Template

Introduction

A complete RFQ (Request for Quotation) gets accurate, comparable quotes from multiple suppliers. An incomplete RFQ produces quotes that vary widely because each supplier assumes different defaults. This guide covers the checklist and a template.

Project Information

Start every RFQ with:

GAOQIAO uses this header on every quotation.

Signal Head Schedule

For each signal head, list:

GAOQIAO can return a quotation within 24 hours when given a complete signal head schedule.

Controller Specifications

Pole and Foundation

Certification and Documentation

Packaging and Shipping

Featured Products

GAOQIAO accepts RFQ in any format. See the traffic light RFQ checklist and the manufacturer selection guide.

Conclusion

A complete RFQ gets accurate quotes. GAOQIAO can return a quotation within 24 hours of receiving a complete RFQ. Send us your project specification for a quotation.

Get a Quote

Email: sky-sale@njgq.net WhatsApp/Phone: +86-18805173545 Tel: +86-25-84471080

Frequently Asked Questions

How long does GAOQIAO take to quote?

24 hours for standard configurations, 3-5 days for complex custom solutions.

Can I send a draft RFQ for review?

Yes, GAOQIAO can review your draft RFQ and suggest improvements before you send it to multiple suppliers.

What is the difference between RFQ and RFP?

RFQ is for a defined product at a defined price. RFP is for a solution that may include design, installation and maintenance.

Relevant GAOQIAO products

These public GAOQIAO catalogue pages are related to the guide. Open them for the representative description, then confirm the latest drawing and configuration before ordering.

Related buyer resources

Request a Traffic Signal RFQ Checklist quotation