Traffic Signal Quality Inspection Before Shipment: A Complete Checklist

Introduction

A pre-shipment inspection catches quality issues before they leave the factory. Without it, the buyer discovers problems at destination, costing weeks of delay and significant rework. This guide covers the standard inspection procedure.

Inspection Trigger

Pre-shipment inspection is recommended for:

GAOQIAO welcomes buyer inspection or third-party inspection (SGS, Bureau Veritas) at our factory.

Sampling Plan

GAOQIAO uses AQL (Acceptable Quality Level) sampling per ISO 2859-1:

For a 100-unit order: sample 20 units, accept if 0-1 major defects and 0-3 minor defects.

Inspection Checklist

The pre-shipment inspection covers:

1. Visual inspection (per sample unit): - No scratches, dents or paint defects - All labels correct and legible - All accessories present - Fasteners tight 2. Photometric test (per sample unit, 5% of lot): - Intensity matches EN12368 / GB14886 class - Chromaticity within spec - Beam distribution matches spec 3. Mechanical test (per sample unit): - Lens impact resistance - Door hinge operation - Gasket compression 4. Electrical test (per sample unit): - Power-on smoke test - All functions operational - Insulation resistance 5. Documentation review (once per lot): - Test certificates present - DoC correct - Packing list accurate

GAOQIAO can complete the full inspection in 1-2 days for a typical 100-unit order.

Handling Defects

If a sample fails:

GAOQIAO's standard AQL gives a clear pass/fail decision. If the lot fails, we rework at no cost before re-inspection.

Featured Products

GAOQIAO accepts buyer or third-party pre-shipment inspection. See the quality control documentation and the sample testing guide.

Conclusion

Pre-shipment inspection protects the buyer's investment. GAOQIAO welcomes inspection at the factory. Send us your order for an inspection schedule.

Get a Quote

Email: sky-sale@njgq.net WhatsApp/Phone: +86-18805173545 Tel: +86-25-84471080

Frequently Asked Questions

How long does pre-shipment inspection take?

1-2 days for a typical 100-unit order. Larger orders take proportionally longer.

Who pays for third-party inspection?

Typically the buyer. Inspection cost is $300-800 per day plus travel for the inspector.

What if the inspection finds defects?

GAOQIAO reworks at no cost and re-inspects. If defects recur, we may offer a discount or accept return.

Relevant GAOQIAO products

These public GAOQIAO catalogue pages are related to the guide. Open them for the representative description, then confirm the latest drawing and configuration before ordering.

Related buyer resources

Request a Traffic Signal Quality Inspect quotation