Traffic Signal Field Acceptance Test Procedure and Commissioning

Introduction

A field acceptance test is the final verification that a newly installed traffic signal is safe and correct before handover. The test follows a written procedure, with every step signed off. This guide covers the standard procedure.

Pre-Test Preparation

Before the field test, the contractor should:

The agency representative witnesses the entire test.

Test Sequence

The standard test sequence is:

1. Visual inspection (30 minutes): walk every component, check for damage, alignment, and labelling 2. Cabinet power-on test (15 minutes): verify AC mains, DC bus voltages, MMU self-test pass 3. Manual phase test (30 minutes): run each phase manually, verify signal head response 4. Conflict monitor test (45 minutes): test every conflict scenario per the pre-printed test sheet 5. Detector test (30 minutes): each detector channel responds correctly to test calls 6. Timing test (60 minutes): run the full timing plan, verify yellow, all-red, pedestrian intervals 7. Coordination test (if applicable) (30 minutes): verify offset and progression with adjacent signals 8. Communication test (if applicable) (15 minutes): verify central system connection and remote commands 9. Backup power test (if applicable) (15 minutes): simulate power loss, verify battery runtime

Total: about 4-5 hours for a typical intersection.

Documentation

The test produces a written record:

GAOQIAO can supply a pre-formatted test sheet package matched to the cabinet and timing plan.

Punch List

Any non-conformance found during the test becomes a punch list item:

The contractor fixes the punch list, then re-tests only the failed steps. After the punch list is closed, the signal is handed over to the agency for operation.

Featured Products

GAOQIAO supplies pre-formatted test sheets and commissioning support for any project size.

Conclusion

A documented field acceptance test is the foundation of a safe handover. GAOQIAO supplies test sheets and commissioning support. Send us your project specification for a test package.

Get a Quote

Email: sky-sale@njgq.net WhatsApp/Phone: +86-18805173545 Tel: +86-25-84471080

Frequently Asked Questions

How long does the field acceptance test take?

4-5 hours for a typical intersection, more for complex or coordinated signals.

Can the test be done by the contractor alone?

The agency representative must witness and sign. Self-certification is not accepted.

What happens if the test fails?

The punch list is created; the contractor fixes and re-tests. The signal is not handed over until every punch list item is closed.