本页的完整译文正在准备中。部分内容暂以原文语言显示。
Define the mounting requirements for a vertical pole
No individual vertical-pole models are currently listed on this page. To discuss a support for a traffic signal installation, begin with the equipment position and mounting interface. Describe what will be attached to the pole and how the installation must allow cable access and future maintenance.
A pole enquiry needs more than an overall height. The equipment arrangement, fixing interfaces, base details and site-specific loading requirements form the basis of the drawing review. Provide the requirements prepared for the project so the proposed supply can be checked against a clear installation brief.
需要提供的项目信息
- Mounted equipment: signal-head references, quantities and desired viewing direction.
- Geometry: required pole height, bracket positions and any clearance constraints.
- Installation: cable route, access opening, base interface and foundation requirements.
- Order information: finish, accessories, quantity, destination and documents needed for approval.
您也可以查看 pole and arm catalogue。请通过以下渠道发送图纸和需求: 联系GAOQIAO 进行配置咨询;供货情况及具体供货范围需要确认。
Record the interfaces that remain on site
For a replacement support, identify whether the existing foundation, anchor arrangement and signal brackets will remain. Provide their drawing references or measured interfaces. A new pole should be reviewed against those retained parts rather than selected only by height or general appearance.
For a new installation, mark the equipment positions and access opening on the proposed elevation. Include the cable route and any requirements for separating electrical equipment from service access. Confirm which base components and fasteners form part of the supply. The final approved drawing provides a clearer inspection reference than a general category description and helps keep installation and purchasing teams aligned.

