本页的完整译文正在准备中。部分内容暂以原文语言显示。

产品 (第1-24项,共117项)
Specify both arms and the equipment they support
The listed double-arm pole provides a starting point for projects that need two arm positions. Confirm the complete drawing, including the direction and reach of each arm, before comparing it with a single-arm support. The headline dimensions do not describe every mounting or structural detail.
Prepare an equipment schedule for both arms and mark the proposed installation on a site drawing. Include cable routing, service access and any clearance constraints. Loading and foundation requirements need to be defined for the actual site and equipment, then matched to the proposed support design.
需确认的信息
- Arm arrangement: identify whether the arms are opposed or require another specified orientation.
- Equipment interfaces: provide the lamp or signal mounting details for each arm.
- Base and foundation: request the relevant drawings and agree which parts are included in supply.
- Delivery and inspection: confirm shipping dimensions, surface-finish requirements, packing and the approved drawing reference.
请将所选产品链接、数量及目的地填写在您的 项目询价。确认订单前,索取该具体配置的图纸和技术资料。
Review the two attachment positions separately
The listed double-arm arrangement should be reviewed with one equipment entry for each arm. Identify the mounting interface and orientation on both sides, even when the fittings look identical. A drawing that shows only the pole centreline can leave the installer without the information needed to position the attachments correctly.
For a replacement, distinguish the retained foundation and fittings from the new supplied structure. For a new installation, keep the base, arm and equipment drawings together. Request clear component identification in the packing list so that the delivered sections and fixing sets can be checked against the approved arrangement before installation is planned.
