Inicio de Gaoqiao

Synchronized Warning Traffic Light – China LED Traffic Light Manufacturer

Se está preparando la traducción completa de esta página. Parte del contenido se muestra en su idioma original.

Banner del fabricante de semáforos 1 Banner de productos de señalización de tráfico 2

Información para la consulta del proyecto

Describe the required warning-light coordination

This category currently has no individual synchronized-light model cards. If the project needs several warning lamps to operate together, state the required behaviour before selecting equipment. A simultaneous flash and a travelling sequence are different arrangements and should be described separately in the enquiry.

Use a simple layout to show the lamp positions, viewing directions and distances between them. Add the operating schedule and proposed power source. The equipment and control arrangement can then be reviewed for that layout; a category name alone does not establish a communication range or a supported number of lamps.

Información del proyecto que debe facilitarse

  • Pattern: identify simultaneous or sequential operation and any required start or stop control.
  • Placement: mark each unit and describe obstructions relevant to communication or visibility.
  • Power: give the operating hours, charging access and site information for a proposed solar option.
  • Supply scope: request a complete system description, unit identification and instructions for replacing a lamp.

También puede consultar published sequential warning systems. Envíe los planos y requisitos a través de contacto de GAOQIAO para consultar la configuración; deben confirmarse la disponibilidad y el alcance exacto del suministro.

Distinguish coordination from a travelling sequence

For simultaneous warning, the requirement is that the specified lamps present the agreed pattern together. For a travelling sequence, the order and direction of the flashes also need to be defined. Send a diagram of the intended behaviour instead of using the word “synchronized” without describing the pattern.

A system enquiry should identify how lamps are grouped, how a replacement unit is added and what behaviour is required if a unit is unavailable. Record these as questions for the proposed configuration, not assumed features. The published sequential-warning category can be used as a reference while the actual control, mounting and power requirements are reviewed.

Solicitar una cotización

Díganos qué necesita. Indique el tipo de señal, el diámetro de la lente, el voltaje y la cantidad para ayudarnos a comprender su aplicación.

sky-sale@njgq.net
Consulta sobre su proyecto / es