Se está preparando la traducción completa de esta página. Parte del contenido se muestra en su idioma original.

Productos (1-24 de 117)
Luz solar intermitente de dos cabezales de 300 mm (12 pulgadas)
Luz solar amarilla intermitente de advertencia, con dos cabezales de 200 mm (8 pulgadas)
Luz solar de advertencia vial de 125 mm (5 pulgadas)
Choose a solar warning configuration from the site conditions
This category shows solar warning products in several lamp sizes and arrangements. A warning lamp enquiry should describe what must be made visible, from which approaches, and during which operating hours. Start with the location and approved warning layout; then compare the model-specific lamp, power and mounting information.
Solar performance depends on the selected electrical load and the installation environment. Send the location, shading photographs, intended duty cycle and required operating period so the proposed panel and storage arrangement can be reviewed. A product image cannot establish runtime at a particular site.
Información por confirmar
- Display: required warning colour, number of faces and flashing behaviour.
- Mounting: pole or structure details, viewing directions and access for servicing.
- Power: proposed operating hours, seasonal shading and any reserve-runtime requirement.
- Handover: requested wiring instructions, battery information, packing details and replacement-part list.
Incluya el enlace del producto elegido, la cantidad y el destino en su consulta de proyecto. Solicite planos y datos técnicos de esa configuración antes de confirmar el pedido.
Compare the warning layout as well as the lamp size
The catalogue includes a compact 125 mm warning lamp and larger two-lamp solar flasher arrangements. These descriptions refer to different layouts. Show whether the project needs several lamps facing the same approach or a warning visible from more than one direction, then compare the selected model drawing with that requirement.
Record the intended pattern and operating hours beside the mounting position. If several units must work together, ask whether the proposed configuration includes the necessary coordination equipment. Keep that request separate from the solar-power specification. During quotation review, confirm the complete unit list, support accessories, charging components and instructions supplied for the exact arrangement.
