Página inicial da Gaoqiao

Vertical Pole – China LED Traffic Light Manufacturer

A tradução completa desta página está sendo preparada. Parte do conteúdo é exibida no idioma original.

Banner do fabricante de semáforos 1 Banner de produtos de sinalização de trânsito 2

Informações para consulta do projeto

Define the mounting requirements for a vertical pole

No individual vertical-pole models are currently listed on this page. To discuss a support for a traffic signal installation, begin with the equipment position and mounting interface. Describe what will be attached to the pole and how the installation must allow cable access and future maintenance.

A pole enquiry needs more than an overall height. The equipment arrangement, fixing interfaces, base details and site-specific loading requirements form the basis of the drawing review. Provide the requirements prepared for the project so the proposed supply can be checked against a clear installation brief.

Informações do projeto a fornecer

  • Mounted equipment: signal-head references, quantities and desired viewing direction.
  • Geometry: required pole height, bracket positions and any clearance constraints.
  • Installation: cable route, access opening, base interface and foundation requirements.
  • Order information: finish, accessories, quantity, destination and documents needed for approval.

Você também pode consultar pole and arm catalogue. Envie os desenhos e requisitos por meio de contato da GAOQIAO para consultar a configuração; a disponibilidade e o escopo exato do fornecimento precisam ser confirmados.

Record the interfaces that remain on site

For a replacement support, identify whether the existing foundation, anchor arrangement and signal brackets will remain. Provide their drawing references or measured interfaces. A new pole should be reviewed against those retained parts rather than selected only by height or general appearance.

For a new installation, mark the equipment positions and access opening on the proposed elevation. Include the cable route and any requirements for separating electrical equipment from service access. Confirm which base components and fasteners form part of the supply. The final approved drawing provides a clearer inspection reference than a general category description and helps keep installation and purchasing teams aligned.

Solicitar orçamento

Conte-nos o que você precisa. Informe o tipo de sinal, o diâmetro da lente, a tensão e a quantidade para nos ajudar a entender sua aplicação.

sky-sale@njgq.net
Consulta sobre o projeto / pt