Página inicial da Gaoqiao

Synchronized Warning Traffic Light – China LED Traffic Light Manufacturer

A tradução completa desta página está sendo preparada. Parte do conteúdo é exibida no idioma original.

Banner do fabricante de semáforos 1 Banner de produtos de sinalização de trânsito 2

Informações para consulta do projeto

Describe the required warning-light coordination

This category currently has no individual synchronized-light model cards. If the project needs several warning lamps to operate together, state the required behaviour before selecting equipment. A simultaneous flash and a travelling sequence are different arrangements and should be described separately in the enquiry.

Use a simple layout to show the lamp positions, viewing directions and distances between them. Add the operating schedule and proposed power source. The equipment and control arrangement can then be reviewed for that layout; a category name alone does not establish a communication range or a supported number of lamps.

Informações do projeto a fornecer

  • Pattern: identify simultaneous or sequential operation and any required start or stop control.
  • Placement: mark each unit and describe obstructions relevant to communication or visibility.
  • Power: give the operating hours, charging access and site information for a proposed solar option.
  • Supply scope: request a complete system description, unit identification and instructions for replacing a lamp.

Você também pode consultar published sequential warning systems. Envie os desenhos e requisitos por meio de contato da GAOQIAO para consultar a configuração; a disponibilidade e o escopo exato do fornecimento precisam ser confirmados.

Distinguish coordination from a travelling sequence

For simultaneous warning, the requirement is that the specified lamps present the agreed pattern together. For a travelling sequence, the order and direction of the flashes also need to be defined. Send a diagram of the intended behaviour instead of using the word “synchronized” without describing the pattern.

A system enquiry should identify how lamps are grouped, how a replacement unit is added and what behaviour is required if a unit is unavailable. Record these as questions for the proposed configuration, not assumed features. The published sequential-warning category can be used as a reference while the actual control, mounting and power requirements are reviewed.

Solicitar orçamento

Conte-nos o que você precisa. Informe o tipo de sinal, o diâmetro da lente, a tensão e a quantidade para nos ajudar a entender sua aplicação.

sky-sale@njgq.net
Consulta sobre o projeto / pt