جارٍ إعداد الترجمة الكاملة لهذه الصفحة. يُعرض بعض المحتوى بلغته الأصلية.
| الطراز: | NJGQ-DGDB-6000-6000 |
|---|---|
| Body_Material: | Steel Q235 |
| الميزات: | Hot Dip Galvanized Antirust + Plastic Coated |
| Running_Time: | اختياري |
| الاتصال: | اختياري |
| مصدر التغذية: | اختياري |
تفاصيل المنتج
المعلومات الأساسية:
| أبعاد المنتج: | 6000*280*220*5MM+6000*190*110*4MM |
|---|---|
| Solar_Panel: | اختياري |
| استهلاك القدرة: | اختياري |
| تيار التشغيل: | اختياري |
| الشهادات: | اختياري |
| الضمان: | 10 Years |
تفاصيل المنتج:
Single Arm Design: Multiple Functions For Adding Traffic light And Street Light
Octagon Shape Design: Stronger And More Beautiful Than Round Shape Design
Hot Dip Galvanized: Antirust And Long Term Use
![]() |
![]() |
|---|---|
| 6M Octagon Light Pole With 6M Arm, Vertical Main Pole & Horizontal Arm Pole | |
| Lengtht:6000/6000MM | Bottom Flange: 550*20MM With 8 Holes |
| Width: 280-220/190-110MM | Top Flange: 350*12MM With 6 Holes |
| Thickness: 5/4MM | Foundation Cage: Additional Charge |
أرسل رسالتك إلينا
Pole, arm and foundation coordination
Pole height and arm reach describe the installation geometry, but the foundation and structural design also depend on the equipment attached to them. List the signal heads, signs, luminaires and any solar components with their positions. The completed loading arrangement should be checked for the project location before fabrication is confirmed.
Compare the mounting drawing with the flange, anchor-bolt pattern and cable route at the site. Clarify whether the foundation cage, fixings and equipment brackets are included. For transport, confirm the longest section, packing method and unloading arrangements so the delivered pole can be handled without damaging its finish.
تفاصيل يجب تأكيدها في الطلب
- الأبعاد الواردة في الكتالوج
- 6000*280*220*5MM+6000*190*110*4MM. Check the drawing for the meaning of each dimension, the bracket allowance and the cable-entry position before comparing it with an existing installation.
معلومات الاستفسار
- Attached equipment, positions and project structural requirements.
- Flange and anchor layout, cable access and foundation scope.
- Arm orientation, packing dimensions and available unloading equipment.


