Gaoqiao home

Bicycle Traffic Signals for Urban Intersections

Quick selection matrix

Use this table to organize the first technical discussion. The approved project drawing and local requirements always take priority.

ConfigurationTypical planning useKey point to confirm
Bi-color bicycle faceCompact dedicated bicycle indicationApproved symbol and controller output
Two-section red/green headSeparated stop and proceed indicationsSection order and mounting orientation
Bicycle signal with countdownCycle phases with remaining-time displayTiming source and transition behavior
Combined pedestrian/bicycle assemblyShared corridor or coordinated crossingPhase drawing and unambiguous symbol layout

Define the bicycle movement first

Show the protected bicycle movement on the intersection drawing and identify which signal head controls it. Confirm whether cyclists move parallel to pedestrians, receive a separate phase or share part of the vehicle sequence. This determines the required color order and prevents a product from being selected only by appearance.

The bicycle symbol should match local regulations and be approved before production. Provide artwork or a referenced standard when a particular symbol shape is mandatory. If the signal combines bicycle, pedestrian or countdown information in one assembly, include a front-layout drawing that shows every indication.

Select size, sections and mounting

Smaller bicycle indications can be appropriate at short viewing distances, while 300 mm or 400 mm faces may be requested for a wider approach or a combined assembly. The project designer should confirm the required size. State whether the product uses a single bi-color face, separate red and green sections, or a multi-section head with a countdown display.

Mounting position is especially important because the indication must be visible to cyclists but should not create ambiguity for drivers in adjacent lanes. Confirm mounting height, lateral offset, pole or bracket arrangement, visor direction and the expected viewing cone.

Coordinate the complete system

Operating voltage, cable routing, terminal arrangement and controller outputs should be reviewed together. A countdown display requires a defined timing source and behavior at phase changes. For solar or wireless installations, also provide the operating schedule, site sunlight information and required autonomy so the complete power arrangement can be evaluated.

A useful request for quotation includes the cycle-lane plan, symbol drawing, signal schedule, quantity, voltage, mounting details, applicable standard and delivery destination. This information supports a precise configuration review and reduces revisions after production begins.

Relevant GAOQIAO products

These product pages are starting points for configuration review. Confirm the complete specification, drawing and controller interface before ordering.

Related buyer resources

Need a project quotation?

Send the signal schedule, drawings, quantity, voltage, required standard, destination and delivery target. GAOQIAO will review the requested configuration before quotation.

Contact GAOQIAO

Bicycle signal configuration

Confirm the required bicycle pictogram, signal colours and aspect arrangement against the project specification. Where bicycle and pedestrian movements share a crossing, identify which indication belongs to each movement. Provide the mounting drawing and any visibility restrictions to be reviewed with the selected signal head. A similar-looking lens does not establish that the housing, voltage or controller interface is interchangeable. For replacement orders, photographs of the front indication and rear electrical label are useful alongside the model reference.

Send your product specification for a quotation

Request a quotation

Tell us what you need. Include your signal type, lens diameter, voltage and quantity to help us understand your application.

sky-sale@njgq.net
Project inquiry / en