| Model Number: | Traffic Controller Cabinet, NJGQ-XHJJG-22-YX220 |
|---|---|
| Body Material: | Powder-Coated Galvanized Sheet Steel |
| Feature: | Small Size + Outdoor Cabinet |
| Power_Supply: | 220VAC±10%, 50~60Hz |
| power_consumption: | <0.2W/system |
Product Details
Basic Information:
| Product Size: | 480*370*810MM+335*255*155MM |
|---|---|
| power_consumption : | <0.2W/system |
| Drive_Current: | ≤8A/output |
| certificate: | CE&IP65 |
| Warranty: | 5 Years |
Product Details:
Powder-Coated Galvanized Sheet Steel Housing: 335*255*155MM For Small Size And Tough Use
Large Outdoor Cabinet: 480*370*810MM With Slope Design For Waterproof
2 Wiring Terminal: Simple And Easy For Smoothly Wiring
22-Output And 4-Phase: 4 Phases For 4 Different Directions By 22 Outputs
![]() |
![]() |
|---|---|
| 22-Output Wire Traffic Controller With Cabinet, NJGQ-XHJJG-22-YX220 | |
| Length: 335MM/480MM | Button Design For Easy Operation |
| Width: 255MM/370MM | 22-Output+4-Phase |
| Height: 155MM/810MM | Large Outdoor Cabinet |
Send your message to us
Controller channels and phase planning
Start with a channel schedule showing every lamp output and the movement it controls. An output count describes connection channels; it does not by itself define the number of junction approaches or a safe phase plan. Keep pedestrian calls, arrow movements and countdown interfaces explicit in the proposed wiring schedule.
Before selecting the controller, compare the lamp supply, load per channel and required switching arrangement with its terminal diagram. Provide the intended sequence, clearance intervals and any external inputs for review. Confirm the startup condition and fault response with the supplier and the project engineer before the unit is installed.
Details to confirm on the order
- Published current reference
- ≤8A/output. Confirm the applicable load conditions and complete wiring diagram for the selected version before assigning connected equipment to its terminals.
Information for your enquiry
- Lamp quantity and electrical load connected to each output.
- Required stages, external inputs and any countdown communication.
- Terminal layout, cabinet space and the approved commissioning sequence.